Online JudgeProblem SetAuthorsOnline ContestsUser
Web Board
Home Page
F.A.Qs
Statistical Charts
Problems
Submit Problem
Online Status
Prob.ID:
Register
Update your info
Authors ranklist
Current Contest
Past Contests
Scheduled Contests
Award Contest
User ID:
Password:
  Register
Language:
Software Company
Time Limit: 1000MSMemory Limit: 30000K
Total Submissions: 1268Accepted: 543

Description

A software developing company has been assigned two programming projects. As both projects are within the same contract, both must be handed in at the same time. It does not help if one is finished earlier.

This company has n employees to do the jobs. To manage the two projects more easily, each is divided into m independent subprojects. Only one employee can work on a single subproject at one time, but it is possible for two employees to work on different subprojects of the same project simultaneously.

Our goal is to finish the projects as soon as possible.

Input

The first line of the input file contains a single integer t (1 <= t <= 11), the number of test cases, followed by the input data for each test case. The first line of each test case contains two integers n (1 <= n <= 100), and m (1 <= m <= 100). The input for this test case will be followed by n lines. Each line contains two integers which specify how much time in seconds it will take for the specified employee to complete one subproject of each project. So if the line contains x and y, it means that it takes the employee x seconds to complete a subproject from the first project, and y seconds to complete a subproject from the second project.

Output

There should be one line per test case containing the minimum amount of time in seconds after which both projects can be completed.

Sample Input

1
3 20
1 1
2 4
1 6

Sample Output

18

Source

[Submit]   [Go Back]   [Status]   [Discuss]

Home Page   Go Back  To top


All Rights Reserved 2003-2013 Ying Fuchen,Xu Pengcheng,Xie Di
Any problem, Please Contact Administrator